The vacuum preloading method has been used in a number of countries for soil improvement and land reclamation works. Prefabricated vertical drains are normally used together with the vacuum preloading technique. When a surcharge load large than the vacuum load is requird, a combined vacuum and fill surcharge preloading method is also adopted. The mechanism of the vacuum preloading method is explained by examining the pore water pressure and effective stress changes in both the fill surcharge and vacuum preloading cases. Two case studies are presented to illustrate the applications of the vacuum preloading method and the combined vacuum and fill surcharge preloading method. Discussions on the effective depth of the vacuum preloading method and the methods to estimate the degree of consolidation are also made.

Original languageEnglish
Pages (from-to)91-117
Number of pages27
JournalElsevier Geo-Engineering Book Series
Volume3
Issue numberC
DOIs
Publication statusPublished - 2005
Externally publishedYes

ASJC Scopus Subject Areas

  • Geotechnical Engineering and Engineering Geology

Fingerprint

Dive into the research topics of 'Chapter 3 Application of the vacuum preloading method in soil improvement projects'. Together they form a unique fingerprint.

Cite this