Abstract
For the Changi East Reclamation Projects in Singapore, about 140 million metres of prefabricated vertical drain (PVD) are being installed. Due to the requirement of large quantity of materials, several types of prefabricated vertical drains are being used. Quality control system was established to check on the quality of vertical drains. The methods and procedure of quality control tests of both hydraulic and mechanical parameters of prefabricated vertical drain are described in this paper. The tests results and the factors affecting the resultant parameters of PVD are discussed.
Original language | English |
---|---|
Publication status | Published - 2018 |
Externally published | Yes |
Event | ISRM International Symposium 2000, IS 2000 - Melbourne, Australia Duration: Nov 19 2000 → Nov 24 2000 |
Conference
Conference | ISRM International Symposium 2000, IS 2000 |
---|---|
Country/Territory | Australia |
City | Melbourne |
Period | 11/19/00 → 11/24/00 |
Bibliographical note
Publisher Copyright:© 2018 ISRM International Symposium 2000, IS 2000. All rights reserved.
ASJC Scopus Subject Areas
- Geochemistry and Petrology
- Geophysics