Abstract
An expedient technique of reducing, significantly, membrane penetration errors and bedding errors at the platens is presented. This technique consists of coating the specimen/membrane and specimen/platen interfaces with a film of liquid rubber of appropriate thickness and properties. This film of liquid rubber is then squeezed into the interstices by a small seatting load/pressure before completion of curing. The effectiveness of this technique is demonstrated by a series of testing.
Original language | English |
---|---|
Pages (from-to) | 311-316 |
Number of pages | 6 |
Journal | Geotechnical Testing Journal |
Volume | 12 |
Issue number | 4 |
DOIs | |
Publication status | Published - 1989 |
Externally published | Yes |
ASJC Scopus Subject Areas
- Geotechnical Engineering and Engineering Geology