TY - GEN
T1 - Use of explosion in improving highway foundation
AU - Shuwang, Yan
AU - Wei, Dong
AU - Jian, Chu
PY - 2009
Y1 - 2009
N2 - Explosion has been used in several soil improvement methods in granular fill densification and in removing and replacing soft soil layer. These methods are briefly reviewed and discussed. A new method, the so-called explosive replacement method, is described. The new method uses energy of explosion to remove and replace soft clay with crushed stones. Explosive charges are placed in the soil to be improved according to a certain pattern. Crushed stones are piled up next to the area where charges are installed. The explosion creates cavities in the soil and causes the pile of crushed stones to slide into the exploded area. A case study on the use of this new method to the soil improvement works for a highway is present. Copyright ASCE 2009.
AB - Explosion has been used in several soil improvement methods in granular fill densification and in removing and replacing soft soil layer. These methods are briefly reviewed and discussed. A new method, the so-called explosive replacement method, is described. The new method uses energy of explosion to remove and replace soft clay with crushed stones. Explosive charges are placed in the soil to be improved according to a certain pattern. Crushed stones are piled up next to the area where charges are installed. The explosion creates cavities in the soil and causes the pile of crushed stones to slide into the exploded area. A case study on the use of this new method to the soil improvement works for a highway is present. Copyright ASCE 2009.
UR - http://www.scopus.com/inward/record.url?scp=69949085017&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=69949085017&partnerID=8YFLogxK
U2 - 10.1061/41025(338)31
DO - 10.1061/41025(338)31
M3 - Conference contribution
AN - SCOPUS:69949085017
SN - 9780784410257
T3 - Geotechnical Special Publication
SP - 290
EP - 297
BT - Advances in Ground Improvement
T2 - Advances in Ground Improvement: Research to Practice in the United States and China - 2009 US-China Workshop on Ground Improvement Technologies
Y2 - 14 March 2009 through 14 March 2009
ER -